Common applications for a 60kVA Generator

Construction site

Emergency & standby power

Telecommunication & data centres

Utilities and manufacturing

Industrial and commercial applications

Mining

Temporary emergency and standby power
Specifications
| Fuel Oil Specifications | Diesel | |
|---|---|---|
| Fuel tank capacity | L | 100 |
| (L) Length | mm | 1.475 |
| (H) Height | mm | 1.275 |
| (W) Width | mm | 750 |
| Autonomy | Hours | 40 |
| Operating Weight | kg | 572 |
Frequently Asked Questions
How much fuel does a 60kVA generator consume?
A 60kVA generator typically uses 12 to 15 litres of diesel per hour, depending on the load. If you’re running it at full capacity, expect it to use closer to the higher end of that range.
What are the noise levels of a 60kVA generator?
Our 60kVA generators are soundproofed for low-noise operation, running at approximately 65–75 dB(A) at 7 metres. Featuring volcanic rock wool insulation, anti-vibration mounts and a fully enclosed steel canopy, they’re quiet enough for residential areas, events and noise-sensitive worksites.
How long can I hire a 60kVA generator for?
We offer rental for flexible periods tailored to the duration of your project. Contact us to discuss your requirements and budget.
What is the cost to hire a 60kVA generator?
The cost to hire a 60kVA generator varies based on your rental duration, delivery location, and any additional accessories required. Contact our team for a free quote and tailored hire options that fit your budget.
Do you provide maintenance during the hire period?
Yes, every generator hire includes full maintenance and support from our team. We’re available 24/7 for servicing or emergency response; simply contact us.
Can I get a 60kVA generator delivered to my site?
We offer fast delivery across NSW, QLD and the ACT, including regional and metro areas. Our team will coordinate logistics and ensure safe, secure delivery right to your location.
Get in touch to discuss your requirements.
Is a 60kVA generator fuel-efficient?
Yes, our 60kVA generators are designed for long-lasting performance and fuel efficiency, helping you reduce overall fuel costs. For example, with a 300-litre tank, you can expect:
- ~52.6 hours of runtime at 50% load
- ~34.1 hours at 75% load
- ~28 hours at 100% load
Do I need any additional accessories when hiring a 60kVA generator?
It depends on your setup. Rental Power can supply all necessary accessories, including cables, distribution boards, bunded fuel tanks, load banks and more. Contact us to discuss your requirements.